References

ELECTRICAL INSTALLATIONS AND OTHERS

TRANSFORMER STATION TS 12 – Seget Donji

Reconstruction of the transformer station, installation of a 630 kVA transformer, installation of the user's MV meeting facility, supply and installation of the LV block, associated construction, locksmith and electrical installation work.

Wi-Fi 4 EU - Solin

Development of a project solution and construction of electrical infrastructure for Wi-Fi access points within the City Administration building, the Zvonimir Cultural Center and on lighting poles within the center of Solin. Supply, installation, parameterization and commissioning of the entire system with access points and battery tanks on lighting poles.

CHARGING STATION FOR ELECTRIC VEHICLES - Dugopolje

Execution of electrical and construction infrastructure for charging station for electric vehicles.

PROSTORIA - Split

Execution of electrical installations of strong and weak current and technical protection system.

REPLACEMENT OF THE ROOF OF THE INDUSTRIAL HALL

Dismantling and disposal of the old asbestos roof and supply and installation of a new thermo-insulating "sandwich" panel with all covering sheets, ridge and gutters.

RADUN HOME - Kaštel Stari

Design, construction and maintenance of: technical protection system - video surveillance and burglary, weak current electrical installation, automatic regulation of HVAC system, KNX Smart Home automation. Design and implementation of noise reduction system.

HOTEL - RESTAURANT "ORA" - Split

Execution of electrical installations works of strong and weak current. Design, supply and installation of lighting fixtures.

CHARGING STATIONS FOR ELECTRIC VEHICLES

Execution of energy and construction infrastructure for charging stations for electric vehicles at various locations in the Split-Dalmatia County.

SRC SPLIT 3

Execution of electrical installation works at the Sports and Recreation Center Split 3.

TRANSFORMER STATION TS 11 - Seget Donji

Reconstruction of the transformer station, replacement of the 630 kVA transformer, installation of surge arresters, supply and installation of the MV switchgear, associated construction, locksmith and electrical installation work.

ELECTRIC GENERATOR - Seget Donji

Supply and installation of an electric generator 165 kVA with the associated automatic transfer switch (ATS) cabinet and all associated construction and electrical work.

RESIDENTIAL - BUSINESS BUILDING "TRSTENIK 5" - Split

Supply, installation and maintenance of the intercom system. Design, supply, installation and commissioning of a video surveillance system.

ESIF financijski instrumenti

The ultimate recipient of a financial instrument co-financed from the European Fund for Regional Development as part of the Operational Program "Competitiveness and Cohesion".

Co-funded by the European Union HAMAG-BICRO